Look out Campton, NH here we come. Dan wanted to come with, but there just wasn't room in the sardine can. Maybe next time.
Vermont Timber Works doesn't always have a pre-install job site meeting, but it seemed to be needed for the White Mountain Administrative Complex Project. Coordinating the steel supports for our heavy timber trusses and Rick did find a few things that needed to be tweaked, so time well spent.
Rick and Rob (P & S Construction) discussed where we would be building the trusses, how the install would flow and where the crane would be. Plan is to be back during the week of 12/1.
Lunch at The Common Man in Ashland, NH on the way back was also time well spent. Thanks for buying Vermont Timber Works.
Vermont Timber Works installs and raises many of their timber frames, but not all. Doug, Peter, Mike, Jason, James, Kellin, Todd and MJ were all involved in this heavy timber truss installation. Great job guys!
Pictured above we have Anne Hanley (President of 
These double chorded douglas fir trusses span 80 feet and the octagonal design is quite something. See the ring truss? Lots of steel joinery in this one! The